2 Down

1.Fasten the bottom plates of the walls to the floor
2.Finish wiring the baseboard heaters and light fixtures
3.Build the walls out to the windows (cover the 1.5" gap) and sprayfoam
4.Attach the final remaining duct boot to the bulkhead
5.Build the step down from the landing to the basement floor
6.Finish insulating
7.Install vapour barrier
 
5 to go...